The Meadowbank open-pit gold mine in the Nunavut Territory of Canada is Agnico Eagle’s first Low Arctic mine and our largest gold producer.

Key Facts

Location Nunavut, Canada
Mine Type Open-pit
Estimated Mine Life 2010-2017
2013 Production 430,613 oz gold
2013 Total Cash Costs $774/oz gold
2013 Mine-Site Costs C$83/tonne
Mineral Titiles 54 (77,774 hectares)
Secondary Metals N/A
Designed Throughput 11,000 tonnes/day
Percentage Ownership 100%
Employees 672
Download - Technical Report (PDF)

3d model

Launch

Meadowbank video

Launch

Regional Map

View